Major Projects Report 2024

Major Projects Report 2024

Published: 21 Aug 2025

Category: Publication

The Major Projects Report provides information on Defence’s management of projects during the year to 30 June 2024.

Download PDF 4.3 MB

Additional info

Additional info

The 2024 report covers the following programmes and projects: Air Surveillance Maritime Patrol (P-8A Poseidon); Future Air Mobility Capability – Tactical (C-130J Hercules); Operational and Regulatory Aviation Compliance Sustainment (ORACS); Anzac Frigate Systems Upgrade; Frigate Sustainment Communications (FSC); Frigate Sustainment Programme; Dive and Hydrographic Vessel (HMNZS Manawanui); Maritime Sustainment Capability (HMNZS Aotearoa); Fixed High Frequency Radio Refresh; Network Enabled Army - C4 and Reconnaissance and Surveillance; and Protected Vehicle – Medium: (NZ5.5 Bushmasters).

The Report is undertaken at the request of Parliament’s Foreign Affairs, Defence and Trade Select Committee. This is the fifteenth Major Projects Report since 2010.

ISBN: 978-0-473-74451-9

© Crown Copyright

This copyright work is licensed under the Creative Commons Attribution 4.0 International licence. In essence, you are free to copy, distribute and adapt the work, as long as you attribute the work to the Ministry of Defence and abide by the other licence terms.